Hwy 299 / Caltrans
HWY 299 / CALTRANS Project in Alturas, CA
Condon Construction was contracted to work on this highway 299 project reconstructing new track, panel crossing and signals.
- Constructed 100’ concrete panel crossing and new signals
- Reconstructed 2,000 feet of track with CWR
- Job completed during a 48-hr shut down of Hwy 299